The arch, the most difficult part of the Rs 1,400-crore bridge over Chenab, is a major leap towards the completion of the 111-km long-winding stretch from Katra to Banihal. It will symbolise the Kashmir rail link, to be ready for at least a century.
The arch, the most difficult part of the Rs 1,400-crore bridge over Chenab, is a major leap towards the completion of the 111-km long-winding stretch from Katra to Banihal. It will symbolise the Kashmir rail link, to be ready for at least a century.